Girder Bridge
Home » Products » Hot Products » Girder Bridge

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Girder Bridge

Following components totally comprise the 350MT Girder Bridge assembly (refer attachment “GIRDER BRIDGE” with payload as per file “LOADING CHART” Automatic Steering – DAC for automatic steering for 12+12 THP/SL attached to the Girder. Refer drawing “TURNING” Auxillary Bogies – 2 nos pendular...
Availability:
Product Description

what is a girder bridge?Following girder bridge components totally comprise the 350MT Girder Bridge frame assembly (refer attachment “GIRDER BRIDGE” with payload as per file “LOADING CHART”

girder-bridge

girder bridge

girder-bridge-examples

girder bridge examples

girder bridge examples,Automatic Steering – DAC for automatic steering for 12+12 Goldhofer THP/SL attached to the Girder frame. Refer drawing “TURNING”

Auxillary Bogies – 2 nos pendular axles with hydraulic manual steering control and connection mechanism to the main Girder frame for usage with the coupling process

Bogie support beams – 2 nos telescopic type with lateral support legs for mounting girders during the coupling process

Bogie support beams – 2 nos telescopic type with lateral support legs for mounting girders during the coupling process

Bolster – 2 units, with ball socket joint. 350MT minimum capacity for single bolster as per attachment “SLEW BEARING”


Cross braces – for manual width adjustment

Hanging beams – 4 sets of Hanging beams, inner loading width 3.5m to 5.5m

Load distribution frames – 2 units, compatible for use with goldhofer THP/SL 12+12 and 14+14 along with bending moment calculation justification

Longitudinal Girders – 1 set main girder with 14m length with lashing coupling provision; 2 pairs end Girder frames for connection with

Power Pack – 1 unit, 23KW Cummins as per attachment “POWER PACK”

girder-frame

girder frame

what-is-a-girder-bridge

what is a girder bridge


Training and Load test

Training for a period of 3 days with technical team with operational manual in English. Load test will be made using 1.2 Factor of safety as per loading chart and deflection and other tests will be performed by buyer or buyer appointed third party inspection agency.


Paint and Finish

Primer and finishing coat China Red (RAL3002) of quality paint, frame sandblasted SA2.5 and zinc dust primed. Power pack and operating panel in Anthracite (RAL7016). Minimum each layer dry film thickness is 30 μ m, the third to fourth floor to red aliphatic polyurethane topcoat, each layer dry film thickness 25 μ m, total film thickness is greater than 110 μ.


Quality Guarantee

The quality guarantee period: 12months (The warranty period of vehicle frame is 5 years under the condition of normal use). In the event of equipment failure within warranty period, rectification and support will be to the cost and risk of the manufacturer. Manufacture Guarantees to abide by the quality specifications as per the document strictly as per review by mutually agreed Third Party Agency.


Documentation and Standards

Operation Manual

Welding standards as per document “Welding Specs Q690D”


Maintenance Manual

Spare part list and BOM to be provided

Access to Design, total manufacturing details of the Girder Bridge for third party inspection


Previous: 
Next: 
PRODUCT INQUIRY

Quick Navigation

Product Category

Contact Us

Shanghai Ruiqianhe Imp & Exp Co.,Ltd
Address: 41-421, No.1818, Lianhang Road, Shanghai, China
Tel: +86-21-34780290
Fax: +86-21-34780291
Mob: +86-13906107837
E-mail: info@heavydutymodule.com

Subscription

Subscribe to our newsletter to receive the latest news.
Copyright © Shanghai Ruiqianhe Imp & Exp Co.,Ltd. All Rights Reserved.