Availability: | |
---|---|
We can offer its Worldwide customers Front Load Trailer which allow us make the loading from the goosneck are. removable gooseneck trailer can carry loads from 30-150 tons with different platform length and different widths. We can use side bars to make the rgn gooseneck trailer width between 2,55 and 4 meters for very wide load.
Front Load Trailer
front load low bed trailer
●Adopt world class parts like Kohler diesel, Bondiolo & Pavesi vavle.
●High tensile steel main frame made for folding gooseneck trailer .
●All wheels steerable automatically or manually.
●Hydraulic axle(suspension) adapt uneven road condition.
●Platform height is adjustable.
●Lifting cylinder make trailer automatically responds tough road conditions.
●Safety valve in hydraulic circuit.
●Brake air tank ensure immediate brake.
●Pendular axle and suspension easy for maintenance.
●Pneumatic and hydraulic quick coupling.
●Modules connecting pin adopts hydraulic cylinder make longitudinal coupling fast.
●Dual-circuit hydraulic system guarantee safe work condition.
●End by end combination and side by side combination of each module are available.
●Small turning radius, 55° steering angle with hydraulic gooseneck.
CHASSIS
–welded by a submerged welding machine from 20-25 mm x 200 mm bottom and top
–Rack is supported with axle beams that crosses rack
HYDRAULIC LEGS-SUSPENSION BEAM-ENGINE
–Remote operated, hydraulic, 4 running legs. Each leg has a capacity of 25 tons
–diesel engine that makes hydraulic legs activated for front loading
AXLES
–2-4 axle shafts with the capacity of 16 tons are used
–With Bogie suspension, Stowage spring
–There are brake shoes and heavy brake levers
TIRES AND RIMS
–315/80 R 22.5
–12 R 22.5
–11.00 R 20
–10.00/20 R 22.5 sizes 16+1 tires are used.
ELECTRICAL SYSTEM
–2×7 pin sockets – 24V, rear stop lamps, side marker lamps, brake safety warning lamps and signal light fitted at the rear
2 tail & stop combined lamps (red)
2 turn signal combined lamps (orange)
1 license lamp (white)
BRAKE SYSTEM
–Dual in line, air operated brake system
KING PIN
–Steel king-pin which is 2” and 3½”
FLOOR
–Diamond embossed sheet and solid floor on tires and on sides
PAINT / COLOR
Before the painting trailer is sand blasted
ZincRich epoxy gray is used for first protecting.
1-2 Times of high quality paints are applied on trailer protects against humadity
The color of trailer is selected by our customer according to RAL codes
STANDARD ACCESSORIES
–2 x 8 expanding brackets(300+300 mm)
–2 x 8 load binding ring
–1 x tool closet(in platform section on axle shafts)
–1 x Tire weld and holder
–1 x chrome water tank with the capacity of 60 lt.
FAQ
Q:How long for the delivery time of detachable gooseneck trailer
A:60 days
Q:Export to asia?
A:Yes