Availability: | |
---|---|
RQH multi axle trailer with one and half combination got awarded the trust to move a total of nine (9) transformers from the Port of Arica, Chile to CODELCO mining site.
Six transformers of 250 ton single weight and three transformers of 275 ton each had to be moved cross the mountain by multi axle .
multi axle side by side loading test
modular transportation
The modular transport had to take place during the rain season which made certain parts of the available roads very complicated to pass.
Especially passing the valley, modular trailer with a total combination weight of over 430 ton with angles going up and down by 15 %, required absolute qualified skills of the local team and our modular trailers equipment.
Delivering all of these factors through inhouse experts and equipment was the reason ,and got awarded this difficult project.
The team is qualified to execute this job and other similar tasks properly and safely.